|
|
Work packages
|
|||
|
The project is composed of eight work packages: |
||||
|
WP1 |
Base line survey on cattle transport | |||
|
WP2 |
Effect of transport time, | |||
|
WP3 |
Long distance transports | |||
|
WP4 |
Vibration and postural stability (to be conducted both in laboratory and field conditions) |
|||
|
WP5 |
Optimising pre and post transport facilities | |||
|
WP6 |
Air quality in vehicles | |||
|
WP7 |
Cattle transport logistics | |||
|
WP8 |
Control system | |||
|
|
||||